mutach tech logo

Royal Links Hospital

Project Description

Multispecialty Hospital at Links Road with High end Facilities, 213 bed capacity with MRI, CT scan, X ray, Radiology, 4 Operating Theatres, Mortuary, All Level 5 facility services, a helipad and many more. Power Intake is at 11kV with a load of 2.5MVA, 5 synchronized Generators and UPS power for Grade 3 and 4 Hospital level rooms. Fully equipped with ICT services for Hospital management system with BMS control for all services.

Tasks Done Under this project
    Income Power intake, Metering, power reticulation and power distribution
    Low and Medium Voltage switching system
    Internal power distribution
    Internal and external lighting
    Telephone and data installation
    Automatic fire detection system
    CCTV surveillance system
    Intruder alarm system
    Tv installation system
    Access control system
    Building management system
    Nursing call station
    4 Generator Back up and syncronized (2.5 MVA)
    Public Address/Voice Alarm Systems
    Pneumatic Transport System
    UPS systems integrated to different functionalities
Project Location
Nyali, Mombasa, Kenya
Project Budget
KSH 1,600,000,000
Project Status
In Progress

Project Gallery

© Mutach Tech Limited 2024

Terms & Conditions

Privacy Policy

Contact